80 Upgrade and Maintenance Manual RX2540 M2
Basic hardware procedures
Figure 12: Securing power cord
Ê Pull the cable clamp up (1).
Ê Thread the power cord through the cable clamp (2).
Ê Press the cable clamp down until it engages to secure the cable (3).
I It will take about 60 seconds until the server can be powered on.