EasyManuals Logo

Raisecom ISCOM2600G-HI (A) Series User Manual

Raisecom ISCOM2600G-HI (A) Series
581 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #423 background imageLoading...
Page #423 background image
Raisecom
ISCOM2600G-HI (A) Series Configuration Guide
9 OAM
Raisecom Proprietary and Confidential
Copyright © Raisecom Technology Co., Ltd.
392
9.4.12 Example for configuring SLA
Networking requirements
As shown in Figure 9-6, SLA is deployed on the Switch, and is periodically scheduled to test
the network performance between Switch A and Switch C.
Figure 9-6 SLA test networking
Configuration steps
Step 1 Configure CFM on the Switch.
For details, see section 9.3.13 Example for configuring CFM.
Step 2 Configure y1731-pkt-loss operation on Switch C, and enable operation scheduling.
Switch_C#config
Switch_C(config)#sla 2 y1731 pkt-loss remote-mac 000e.5e00.0001 level 3
svlan 3
Switch_C(config)#sla schedule 2 life 20 period 10
Checking results
Use the show sla configuration command on Switch C to show SLA configurations.
Raisecom#show sla 2 configuration
------------------------------------------------------------------------
Operation <2>:
Type: ETH-Y1731-PKT-LOSS
Frame Type: SLM
Schedule Starttime: 0 days, 00:00:00
------------------------------------------------------------------------
CoS: 7

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Raisecom ISCOM2600G-HI (A) Series and is the answer not in the manual?

Raisecom ISCOM2600G-HI (A) Series Specifications

General IconGeneral
BrandRaisecom
ModelISCOM2600G-HI (A) Series
CategorySwitch
LanguageEnglish

Related product manuals