TABLE OF CONTENTS
PARAGRAPH PAGE
1. CIRCULAR AREA UNITS 2
A. Circular Area Units of Conductors 2
B. Circular Area Units of Terminals 4
C. Circular Area Units of Splices 6
D. Circular Area Units of Adapters 7
2. ASSEMBLY WHEN THE WIRE SIZE IS SMALLER THAN THE CRIMP BARREL SIZE
8
A. CAU of the Conductor and the Crimp Barrel 8
B. Assembly with the Conductor Folded Back 8
C. Assembly with a BACA14AN() Splice Adapter 10
D. Assembly with a Filler Wire Stub 10
E. Assembly with a Filler Wire Loop 11
3. ASSEMBLY WHEN THE WIRE INSULATION IS SMALLER THAN THE INSULATION GRIP
11
A. Applicable Conditions 11
B. Installation of a Heat Shrinkable Sleeve 11
4. ASSEMBLY WITH MORE THAN ONE WIRE
12
A. General Conditions for Wire Insulation 12
B. Assembly with More Than One Conductor 14
C. Selection of a Terminal or a Splice 14
707, 727-787
STANDARD WIRING PRACTICES MANUAL
ASSEMBLY OF TERMINALS AND SPLICES UNDER SPECIAL CONDITIONS
20-30-22
Page 1
Oct 15/2017D6-54446
ECCN 9E991 BOEING PROPRIETARY - See title page for details