4-1
In This Section
This section describes final adjustments to, and complete final inspection of, the elevator sys-
tem. At this point, all steps in Sections 2 and 3 should have been completed.
• Learning the Floor Heights (see page 4-2).
• Verifying One-Floor Run Operation (see page 4-3).
• Reaching Contract Speed (System 12 SCR Drive) (see page 4-7).
• Reaching Contract Speed (Quattro DC Drive) (see page 4-11)
• Learning Normal & Emergency Terminal Limit Switches (see page 4-13).
• Synthetic Speed Calibration (System 12 SCR Drive) (see page 4-15).
• Feed Forward Gain Calibration (System 12 SCR Drive) (see page 4-16).
• Fine Tuning the Speed Regulator (Quattro DC Drive) (see page 4-17).
• Shaping the Speed Profile (see page 4-17).
• Controlling the Start of Car Motion (see page 4-21).
• Calibrating the Floor Offsets (see page 4-28).
• Adjusting Leveling and Final Stop (see page 4-31).
•Load Weigher Adjustment for Dispatching (see page 4-36).
• Pre-Start Sequence (see page 4-41).
• Calibration and Verification of Safety Functions (see page 4-47).
• Safety Tests (see page 4-50).
• Terminal Switch Faults (see page 4-57).
Final Adjustment