iControl DC
Required Connections The following connections are necessary to run the car on Con-
struction Mode:
Motor, Brake, and Drive
Velocity Encoder or Tachometer
SAFH, GOV, ESC, Rope Gripper (if enabled)
SAFC (provide temporary Emergency stop switch between SAFH and SAFC if iLink is not
yet installed)
UNTD and DNTD (Up and Down Normal Limit Switches)
GS, DLMS, DLAT, DLAB, DPM (Verify the iView/Safety Configuration screen settings for
these options)
INCT, ICTU, and ICTD
Emergency Power Input
Connections not required for Construction Mode operation include:
Cartop Communication (TX, RX)
Quadrature signal (DP1, DP2)
•EQ signal
Terminal Switches (U/DNTx and U/DETS)
•Fire Sensor
•DZ, ULM, DLM
Please refer to “iBox Field Connections” on page 11-7 for definitions of iBox inputs and outputs.
Faults While operating in Construction Mode, faults may be generated due to incomplete
installation. These may be disregarded in this phase and include:
Invalid Front and/or Rear Doors
•Terminal Sync
System Sync
•Floor Sync

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MCE iControl and is the answer not in the manual?

MCE iControl Specifications

General IconGeneral
BrandMCE
ModeliControl
CategoryController
LanguageEnglish