(l) Complete the cycle to put the ram in the down position.
1) Make sure that:
2) The dies are installed with the alignment marks on the same side of the tool head.
3) The dies are attached correctly to the tool head.
4) The latch pin is fully installed in the tool head.
ASSEMBLY OF BACT12BC TE ALUMINUM TERMINALS
707, 727-787
STANDARD WIRING PRACTICES MANUAL
20-30-08
Page 16
Oct 15/2017D6-54446
ECCN 9E991 BOEING PROPRIETARY - See title page for details