EasyManuals Logo

Cisco AP775A - Nexus Converged Network Switch 5010 Reference

Cisco AP775A - Nexus Converged Network Switch 5010
886 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #690 background imageLoading...
Page #690 background image
Send document comments to nexus7k-feedback-doc@cisco.com
2-652
Cisco NX-OS System Messages Reference
OL-15994-03
Chapter 2 System Messages and Recovery Procedures
SVC Messages
SVC-6
Error Message SVC-6-NODE_INFO_MSG: (SVC [dec]/[dec] SS_EID_CA_EV_ALL_DATA_UNPINNED
) All data now unpinned [chars]
Explanation All the customer data in the IO group is now unpinned.
Recommended Action Contact the Cisco Technical Assistance Center (TAC) through the Cisco
Support web site http://www.cisco.com/tac.
Error Message SVC-6-NODE_INFO_MSG: (SVC [dec]/[dec]
SS_EID_CA_EV_HWS_TO_ASYNCHRONOUS ) Pinned data reduced; cache can operate normally
[chars]
Explanation Enough customer data has been unpinned that the cache is no longer required to operate
in write through mode because of the pinned data. (Note that the cache may still operate in write
through mode for other reasons.).
Recommended Action Contact the Cisco Technical Assistance Center (TAC) through the Cisco
Support web site http://www.cisco.com/tac.
Error Message SVC-6-NODE_INFO_MSG: (SVC [dec]/[dec] SS_EID_EC_ER_BATT_OK ) Battery
recharged [chars]
Explanation Battery capacity has been restoredddd to above threshold. The node will now come
online.
Recommended Action Contact the Cisco Technical Assistance Center (TAC) through the Cisco
Support web site http://www.cisco.com/tac.
Error Message SVC-6-NODE_INFO_MSG: (SVC [dec]/[dec] SS_EID_EC_ER_BATT_POWER_DOWN )
Poweroff or power failure detected [chars]
Explanation The process has received a poweroff or power failure indication. The node is shutting
down.
Recommended Action Restore power. If power was not removed and this occurs: 1. Reload the node.
2. If the error persists, re-install the code on the line card. The node(s) will then have to be removed
and re-added back to the cluster. 3. If the error persists, replace the Caching Services Module.
Error Message SVC-6-NODE_INFO_MSG: (SVC [dec]/[dec] SS_EID_EC_ER_PWR_BUTTON ) Power
withdrawn [chars]
Explanation Node software was notified that AC power was being shut off or the Caching Services
Module was being reset.
Recommended Action Contact the Cisco Technical Assistance Center (TAC) through the Cisco
Support web site http://www.cisco.com/tac.

Table of Contents

Other manuals for Cisco AP775A - Nexus Converged Network Switch 5010

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco AP775A - Nexus Converged Network Switch 5010 and is the answer not in the manual?

Cisco AP775A - Nexus Converged Network Switch 5010 Specifications

General IconGeneral
BrandCisco
ModelAP775A - Nexus Converged Network Switch 5010
CategorySwitch
LanguageEnglish

Related product manuals