Replenish Polymer—Install polymer and prime pump
In this procedure, you install a new polymer pouch and prime the pump with fresh polymer.
1.
Allow the refrigerated polymer to equilibrate to ambient temperature (15–30°C) before use.
2.
Open the instrument doors.
3.
Remove the polymer pouch by pressing the polymer pouch lever down.
Figure 64 Location of pump, ABC, and pouch
1
Polymer pump block
2
Anode Buer Container (ABC), r
emove and replace with an empty ABC to capture waste
3
Pouch, remove polymer and replace with conditioning reagent
Chapter 13 Maintain the Instrument
Maintenance wizard procedures
13
418
SeqStudio
™
Flex Series Genetic Analyzer with Instrument Software v1.0 User Guide