Reactivate the instrument (wizard)
During this wizard, you install the CBC and the capillary array.
IMPORTANT! If an aut
osampler error or a "power save" message is displayed, or if the CBC is not in
the forward, home position when you need to install the CBC, see “Check the position of the cathode
buer container (CBC)” on page 483.
1.
In the home scr
een, tap
Actions4Maint
enance4Maintenance wizards4Reactivate
instrument.
2.
Follow the instructions in the wizard to perform the procedure. See “Reactivate Instrument
maintenance wizard” on page 427.
Maintenance wizard procedures
Change Capillary Array maintenance wizard
Change Capillary Array—Time and materials required
Use the Change C
apillary Array maintenance wizard to change capillary array.
Note: To change the capillary array and the polymer type, run the Change Polymer Type maintenance
wizard.
Item Requirements
Time required ~12—15 minutes
Materials required to change the
capillar
y array
•
New or previously stored capillary array
•
Purified water (distilled or deionized)
•
Lint-free lab wipes
Materials required to store the
capillary array (retained from a
previously used capillary array or
obtained from a new capillary
array)
•
Detection cell cover
•
Array tip cover
•
Array electrode cover
Tap Ne
xt to continue.
Change Capillary Array or Shut Down Instrument—Select action for the capillary
array
Tap Store or Discard to select the option for the capillary array after it is removed from the instrument.
Chapter 13 Maintain the Instrument
Maint
enance wizard procedures
13
382
SeqStudio
™
Flex Series Genetic Analyzer with Instrument Software v1.0 User Guide