EasyManua.ls Logo

Thermo Scientific appliedbiosystems SeqStudio Flex Series - Shut down Instrument Maintenance Wizard

Thermo Scientific appliedbiosystems SeqStudio Flex Series
574 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Shut Down Instrument maintenance wizard
Shut Down Instrument—Time and materials required
Use the Shut Down Instrument maintenance wizard to shut down the instrument for a storage period
>2 weeks.
This wizard instructs you to remove the capillary array and polymer, install conditioning reagent, and
wash the pump and channels with conditioning reagent.
Item Requirements
Time required ~55 minutes
Materials required
Detection cell cover
Array tip cover
Array electrode cover
Conditioning reagent pouch
Empty Anode Buer Container (ABC)
Array port plug (from the holder on the pump block near the buer
valve)
Purified water (distilled or deionized)
Lint-free lab wipes
Tap Next to continue.
Shut Down Instrument—Remove capillary array
WARNING! SHARP The electrodes on the load-end of the capillary array have small, blunt ends that
can lead to piercing injury.
IMPORTANT! If an aut
osampler error or a "power save" message is displayed, or if the CBC is not in
the forward, home position when you need to remove the capillary array, see “Check the position of the
cathode buer container (CBC)” on page 483.
Chapter 13 Maintain the Instrument
Maintenance wizard procedures
13
420
SeqStudio
Flex Series Genetic Analyzer with Instrument Software v1.0 User Guide

Table of Contents

Related product manuals