EasyManua.ls Logo

Dell PowerVault ML6000 - Preparing to Use the 5 U Library Control Module

Dell PowerVault ML6000
494 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PowerVault ML6000 Maintenance Guide 91
11 If tape blockers are required, make sure they are installed in the bottom two rows of the library. The tape
blockers block slots in the bottom two rows of the library. You can insert the tape blockers through the
open access door.
Preparing to Use the 5U Library Control Module
1 Close the library’s I/E station and access doors.
2 Add the tape drives to the modules. For details, see Adding, Removing, and Replacing Tape Drives
on
page 127.
3 Add the power supplies. For details, see Adding, Removing, and Replacing Power Supplies
on page
106.
4 Install the LCB from the removed 5U Library Control Module in the new 5U Library Control Module. For
details, see Removing and Replacing the Library Control Blade and LCB Compact Flash Card
on page
102.
5 Connect all power cords, network data cables, and module-to-module cables. Make sure the module
terminators are installed in their previous positions at the top and bottom of the stack of modules. For
cabling instructions, see Cabling the Library
on page 22.
6 Power on the library.
7 Re-create and/or modify partitions, cleaning slots, and I/E station slots as desired.
CAUTION
Libraries that have a Model 2 robot installed no longer use tape blockers. If
your library contains a Model 2 robot, do NOT install tape blockers. For
more information, see Removing and Replacing the Robot Assembly
on
page 164 and How to Determine Which Robot Your Library Contains
on
page 165.
1 access door 2 tape blockers (installed)
1
2

Table of Contents

Other manuals for Dell PowerVault ML6000

Related product manuals