EasyManua.ls Logo

Dell PowerVault ML6000 - Adding 9 U Expansion Modules to an Existing Library

Dell PowerVault ML6000
494 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56 Library Installation and CRU Replacement
c. Gently release the robot assembly. It will lower to the bottom module of the library.
2 Close the library’s I/E station and access doors.
3 Add the tape drives to the modules. For details, see Adding, Removing, and Replacing Tape Drives
on
page 127.
4 If your library contains FC I/O blades, install both the I/O blades and the accompanying fan blades in
the expansion module. For details, see Adding, Removing, and Replacing FC I/O Blades
on page 130
and Adding, Removing, and Replacing the FC I/O Fan Blade
on page 137.
5 Add the power supplies. For details, see Adding, Removing, and Replacing Power Supplies
on page
106.
6 Connect all power cords, network data cables, and module-to-module cables. Make sure the module
terminators are installed at the top and bottom of the stack of modules. For cabling instructions, see
Cabling the Library
on page 22.
7 Power on the library. For libraries larger than a ML6020, boot time may take 15-20 minutes.
8 Configure the library using the Setup Wizard that appears on the operator panel interface.
9 Add the tape cartridges to the library’s modules using the I/E station commands from the operator panel
or Web client.
10 Open the host application and reinventory in order to synchronize its logical inventory with the physical
inventory of the library.
Adding 9U Expansion Modules to an Existing Library
Adding 9U Expansion Modules to the library increases the number of data cartridges available within the
library system. These instructions explain how to add a 9U Expansion Module to an existing library.
Model 2 tab
Model 1 tab

Table of Contents

Other manuals for Dell PowerVault ML6000

Related product manuals