24 Library Installation and CRU Replacement
Cabling Libraries with SCSI Tape Drives
Use this procedure, along with Figure 3 and Figure 4 on page 25, if you are installing a library that includes
SCSI tape drives:
Figure 3 Stand-Alone 5U Library Control Module SCSI Cabling
ALL LIBRARIES TALLER THAN 14U MUST BE INSTALLED IN A RACK
HAVING A MAIN PROTECTIVE EARTHING (GROUNDING) TERMINAL,
AND POWER MUST BE SUPPLIED VIA AN INDUSTRIAL PLUG AND
SOCKET-OUTLET AND/OR AN APPLIANCE COUPLER COMPLYING
WITH IEC 60309 (OR AN EQUIVALENT NATIONAL STANDARD) AND
HAVING A PROTECTIVE EARTH (GROUND) CONDUCTOR WITH A
CROSS SECTIONAL AREA OF AT LEAST 1.5 MM
2
(14 AWG).
TO ENSURE PROPER AIRFLOW AND ACCESS SPACE, ALLOW 60 CM
(24 INCHES) IN THE FRONT AND BACK OF THE LIBRARY.
1 Ethernet cable to customer
network
2 GB Ethernet port
3 SCSI terminator
4 Power supply
5 Rear power switch
6 SCSI cable to host
7 Library control blade
8 Module terminators