EasyManua.ls Logo

Dell PowerVault ML6000 - Page 84

Dell PowerVault ML6000
494 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66 Library Installation and CRU Replacement
8 Engage the Y-rails of the new module in your library configuration. Ensure that the Y-rails are properly
aligned and the thumbscrews are tightened.
a. From the front of the library, open the I/E station and access doors of the 9U Expansion Module.
b. Squeeze the handle of the Y-rail release mechanism, lift it out of its locked position, and slide
it downward as far as it will go.
1 Front Y-rail
2 Rear Y-rail
3 Y-rail (this end up)
4 Squeeze here to release
1
3
2
4

Table of Contents

Other manuals for Dell PowerVault ML6000

Related product manuals