Installing a New Stackable System of Up to Eight Units
2-2 Configuring Switches in a Stack
•Theconsoleportonthemanagerswitchremainsactiveforoutofband(local)switch
management,buttheconsoleportoneachmemberswitchisdeactivated.Thisenablesyouto
settheIPaddressandsystempasswordusingasingleconsoleport.Noweachswitchcan be
configuredlocallyusingonly
themanagersconsoleport,orinbandusingaremotedeviceand
theCLIsetofcommandsdescribedinthissection.
Onceastackiscreated(morethanoneswitchisinterconnected),thefollowingprocedureoccurs:
1. Bydefault,unitIDsarearbitrarilyassignedonafi rstcome,firstservedbasis.
2. UnitIDs
aresavedagainsteachmodule.Then,everytimeaboardispowercycled,itwill
initializewiththesameunitID.Thisisimportantforportspecificinforma tion(forexample:
ge.4.12isthe12thGigabitEthernetportonUnit#4).
3. Themanagementelectionprocessusesthefollowingprecedencetoassign
amanagement
switch:
a. Previouslyassigned/electedmanagementunit
b. Managementassignedpriority(values115)
c. Hardwarepreferencelevel
d. HighestMACAddress
Usethefollowingrecommendedprocedureswheninstallinganewstackablesystemoraddinga
newunittoanexistingstack.
Installing a New Stackable System of Up to Eight Units
Usethefollowingprocedureforinstallinganewstackofuptoeightunitsoutofthebox.
1. Beforeapplyingpower,makeallphysicalconnectionswiththestackcablesasdescribedinthe
SecureStackC2InstallationGuides.
2. Onceallofthestackcableshavebeenconnected,individuallypoweroneachunit
fromtopto
bottom.
3. (Optional)Ifdesired,changethemanagementunitusingthesetswitchmovemanagement
commandasdescribedinsetswitchmovemanagementonpage211.
4. Oncethedesiredmasterunithasbeensel ected,resetthesystemusingtheresetcommand
(page348).
5. Afterthestackhas
beenconfigured,youcanusetheshowswitchunitcommand(page26)to
physicallyidentifyeachunit.Whenyouenterthecommandwithaunitnumber,theMGR
LEDofthespecifiedswitchwillblinkfor10seconds.ThenormalstateofthisLEDisofffor
memberunitsand
steadygreenforthemanagerunit.
Important
The following procedures assume that all units have a clean configuration from manufacturing. When adding
a new unit to an already running stack, it is also assumed that the new unit is using the same firmware image
version as other units in the stack.
Notes: Ensure that each switch is fully operational before applying power to the next switch.
Since unit IDs are assigned on a first-come, first-served basis, this will ensure that unit IDs are
ordered sequentially.
Once unit IDs are assigned, they are persistent and will be retained during a power cycle to any or
all of the units.

Table of Contents

Other manuals for Enterasys SecureStack C2 C2G170-24

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Enterasys SecureStack C2 C2G170-24 and is the answer not in the manual?

Enterasys SecureStack C2 C2G170-24 Specifications

General IconGeneral
BrandEnterasys
ModelSecureStack C2 C2G170-24
CategorySwitch
LanguageEnglish

Related product manuals