1-12
1
Prior to securing the TR250 to the oor
If a Coin Handler is being installed with the TR250:
X Perform placement and bolt down procedures for the Coin Handler prior to installing
the securing bolts into the anchors
See pages 1-14 through 1-18
X After the both cabinets are in place and aligned, install the securing bolts into the an-
chors
X Connect any network cables, power cords or ground wiring to the appropriate con-
nections behind the equipment
X Securing bolts should be tightened until “snug” - do not overtighten
Step 11: Align the cabinet with the outlines created with the bolt down template.
Step 12: Install the rear (4) anchor bolts ONLY - Do not install the front 2 anchor bolts at this time.