Concepts and features
R&S
®
ZNA
328User Manual 1178.6462.02 ─ 29
Priority 1 Routes
Priority 2 Routes
Figure 4-49: ZV-Z81 Routes and priorities
Example:
For an R&S ZN-Z8x, each route traverses exactly one of the equipped 2x6 modules.
The overall route quality is determined by the number of solid state switches traversed
on this 2x6 module:
SP4T SP4T SP4T SP4T SP4T SP4T
SP4TSP4T
SP3T SP3T
2x6 Module
Priority 1 Routes
Priority 2 Routes
Figure 4-50: Routes and priorities
See the data sheet of the respective switch matrix for details on the available routes.
Optional extensions and accessories