EasyManuals Logo

Lucent Technologies CBX 3500 User Manual

Lucent Technologies CBX 3500
888 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #690 background imageLoading...
Page #690 background image
Beta Draft Confidential
18-261/19/05 ATM Services Configuration Guide for CBX 3500, CBX 500, GX 550, and B-STDX 9000
Configuring SPVCs
Defining a Point-to-Point Offnet Circuit Connection
6. After defining non-Lucent nodes, click Lucent Node to define the next hop to a
Lucent switch, entering the internal IP Address of the next Lucent switch node
and optional logical port interface ID.
Navis EMS-CBGX adds the path to the Defined Path section when the path is
complete.
7. Choose OK when you have defined the path.
8. In the Path tab, select (enable) or clear (disable) the Use Defined Path check box
to specify whether to use the defined path or to enable the network routing to
specify the circuit path.
• Check box selected (Enabled) – Routes the circuit based on the manually
defined route.
• Check box cleared (Disabled) – Routes the circuit based on the network’s
OSPF algorithm.
9. Enable or disable the Alternate Path check box to specify whether OSPF should
route the circuit path if the manual route fails.
• Yes – Enables OSPF to route the circuit based on the best available path if the
manually defined path fails.
• No – Prevents the circuit from being rerouted; the circuit remains down until
the defined path is available.
10. In the Add OffNet Circuit dialog box, choose OK to add or modify the circuit
when your configuration is complete.

Table of Contents

Other manuals for Lucent Technologies CBX 3500

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lucent Technologies CBX 3500 and is the answer not in the manual?

Lucent Technologies CBX 3500 Specifications

General IconGeneral
BrandLucent Technologies
ModelCBX 3500
CategorySwitch
LanguageEnglish

Related product manuals