Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 5 Turn Up a Network
NTP- D339 Point-to-Point Network Acceptance Test
Step 5 Complete the “DLP-D363 Provision Regenerator-Section DCC Terminations” task on page 20-68 for
the working STM-N port on both point-to-point nodes. Alternatively, if additional bandwidth is needed
for CTC management, complete the “DLP-D364 Provision Multiplex-Section DCC Terminations” task
on page 20-71.
Note Data communications channel (DCC) terminations are not provisioned on the protect ports.
Note If the point-to-point nodes are not connected to a LAN, you will need to create the DCC
terminations using a direct (craft) connection to the node. Remote provisioning is possible only
after all nodes in the network have DCC terminations provisioned to Unlocked-enabled STM-N
ports.
Step 6 Complete the “DLP-D214 Change the Service State for a Port” task on page 19-10 to put the protect card
in the Unlocked-enabled service state.
Step 7 As needed, complete the “DLP-D81 Provision a Proxy Tunnel” task on page 17-73.
Step 8 As needed, complete the “DLP-D90 Provision a Firewall Tunnel” task on page 17-83.
Step 9 As needed, complete the “DLP-D40 Create a Provisionable Patchcord” task on page 17-31.
Step 10 Verify that timing is set up at both point-to-point nodes. If not, complete the “NTP-D28 Set Up Timing”
procedure on page 4-9 for one or both of the nodes. If a node uses line timing, make its working STM-N
the timing source. The system will automatically choose the corresponding protect STM-N card as the
protect timing source. This will be visible in the Maintenance > Timing tab.
Step 11 Complete the “NTP-D339 Point-to-Point Network Acceptance Test” procedure on page 5-4.
Stop. You have completed this procedure.
NTP-D339 Point-to-Point Network Acceptance Test
Step 1 Complete the “DLP-D60 Log into CTC” task on page 17-49 at one of the point-to-point nodes. The node
(default) view appears. If you are already logged in, continue with Step 2.
Step 2 From the View menu, choose Go to Network View.
Step 3 Click the Alarms tab.
a. Verify that the alarm filter is not on. See the “DLP-D227 Disable Alarm Filtering” task on
page 19-25 as necessary.
Purpose This procedure tests a point-to-point network.
Tools/Equipment Test set/cables appropriate to the test circuit you will create.
Prerequisite Procedures NTP-D124 Provision a Point-to-Point Network, page 5-3
Required/As Needed As needed
Onsite/Remote Onsite
Security Level Provisioning or higher