17-25
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 17 DLPs D1 to D99
DLP- D30 Repair an IP Tunnel
DLP-D30 Repair an IP Tunnel
Step 1 Obtain the original IP address of the node in question.
Step 2 From the View menu, choose Go to Network View.
Step 3 From the Tools menu, choose Overhead Circuits > Repair IP Circuits.
Step 4 Review the text in the IP Repair wizard and click Next.
Step 5 In the Node IP address area, complete the following:
• Node—Choose the node that has a PARTIAL circuit.
• Old IP Address—Type the node’s original IP address.
Step 6 Click Next.
Step 7 Click Finish.
Step 8 Return to your originating procedure (NTP).
DLP-D31 Delete Overhead Circuits
Caution Deleting overhead circuits is service affecting if the circuit ports are in the Unlocked-enabled service
state. To place circuit ports in the Locked-enabled,disabled service state, see the “DLP-D214 Change
the Service State for a Port” task on page 19-10.
Step 1 From the View menu, choose Go to Network View.
Step 2 Click the Provisioning > Overhead Circuits tabs.
Purpose This task repairs circuits that are in the PARTIAL status as a result of node
IP address changes.
Tools/Equipment None
Prerequisite Procedures See Chapter 6, “Create Circuits and Low-Order Tunnels” for circuit
creation procedures.
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher
Purpose This task deletes overhead circuits. Overhead circuits include DCC
tunnels, IP-encapsulated tunnels, the AIC-I card orderwire, and the AIC-I
card user data channel (UDC).
Tools/Equipment None
Prerequisite Procedures DLP-D60 Log into CTC, page 17-49
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher