EasyManua.ls Logo

Cisco ONS 15454 SDH - NTP- D351 Convert a Point-To-Point or Linear ADM to an SNCP Automatically

Cisco ONS 15454 SDH
860 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13-10
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 13 Convert Network Configurations
NTP- D351 Convert a Point-to-Point or Linear ADM to an SNCP Automatically
Step 12 Complete the “DLP-D363 Provision Regenerator-Section DCC Terminations” task on page 20-68 at the
end nodes; provision the slot in each node that is not already in the RS-DCC Terminations list (in the
Figure 13-3 example, Port 1 of Node 1/Slot 5 and Port 1 of Node 3/Slot 13). (Alternatively, if additional
bandwidth is needed for CTC management, complete the “DLP-D364 Provision Multiplex-Section DCC
Terminations” task on page 20-71.)
Step 13 For circuits provisioned on a VC4 that is now part of the protection bandwidth (VC4s 3 to 4 for an
STM-4 MS-SPRing, VC4s 9 to 16 for an STM-16 MS-SPRing, and VC4s 33 to 64 for an STM-64),
delete and recreate each circuit:
a. Complete the “DLP-D27 Delete Circuits” task on page 17-21 for one circuit.
b. Create the circuit on VC4s 1 to 2 for an STM-4 MS-SPRing, 1 to 8 for an STM-16 MS-SPRing, or
1 to 32 for an STM-64 MS-SPRing on the fiber that served as the protect fiber in the linear ADM.
See the “NTP-D324 Create a Manually Routed High-Order Circuit” procedure on page 6-60 for
instructions.
c. Repeat Steps a and b for each circuit residing on an MS-SPRing protect VC4.
Step 14 Complete the “NTP-D41 Create the MS-SPRing” procedure on page 5-13 to put the nodes into an
MS-SPRing.
Stop. You have completed this procedure.
NTP-D351 Convert a Point-to-Point or Linear ADM to an SNCP
Automatically
Note When upgrading VT tunnels, CTC does not convert the VT tunnel to SNCP, but instead creates a
secondary tunnel for the alternate path. The result is two unprotected VT tunnels using alternate paths.
Note If overhead circuits exist on the network, an in-service topology upgrade is service affecting. The
overhead circuits will drop traffic and have a status of PARTIAL after the upgrade is complete.
Step 1 Complete the “DLP-D60 Log into CTC” task on page 17-49 at a node on the point-to-point or linear
ADM. If you are already logged in, continue with Step 2.
Step 2 If the point-to-point or linear ADM is 1+1 protected, complete the “DLP-D155 Delete a Protection
Group” task on page 18-47. If the point-to-point or linear ADM is unprotected, continue with Step 3.
Purpose This procedure upgrades a point-to-point or linear ADM to an SNCP
without disrupting traffic. You can upgrade synchronous transport signal
(STS), Virtual Tributary (VT), and VT tunnel circuits to SNCP. This
option is a single circuit operation.
Tools/Equipment None
Prerequisite Procedures NTP-D124 Provision a Point-to-Point Network, page 5-3
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher

Table of Contents

Other manuals for Cisco ONS 15454 SDH

Related product manuals