5-23
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 5 Turn Up a Network
NTP- D44 Provision SNCP Nodes
Step 1 Verify that the fiber is correctly connected to the SNCP trunk (span) STM-N cards similar to Figure 5-6.
See the “DLP-D337 Install Fiber-Optic Cables for SNCP Configurations” task on page 20-33 for more
information.
Figure 5-6 SNCP Fiber Connection Example
Step 2
Log into an ONS 15454 SDH in the SNCP you are turning up. See the “DLP-D60 Log into CTC” task
on page 17-49. If you are already logged in, continue with Step 3.
Step 3 Complete the “DLP-D363 Provision Regenerator-Section DCC Terminations” task on page 20-68 for
the two cards/ports that will serve as the SNCP ports on the node, for example, Slot 5 (STM-16)/Node
1 and Slot 12 (STM-16)/Node 1. (Alternatively, if additional bandwidth is needed for CTC management,
complete the “DLP-D364 Provision Multiplex-Section DCC Terminations” task on page 20-71.)
Note If an ONS 15454 SDH is not connected to a corporate LAN, DCC or multiplex section DCC
(MS-DCC) provisioning must be performed through a direct (craft) connection. Remote
provisioning is possible only after all nodes in the network have DCC or MS-DCC terminations
provisioned to Unlocked-enabled STM-N ports.
Step 4 Repeat Steps 2 and 3 for each node in the SNCP.
Step 5 As needed, complete the “DLP-D81 Provision a Proxy Tunnel” task on page 17-73.
Step 6 As needed, complete the “DLP-D90 Provision a Firewall Tunnel” task on page 17-83.
Step 7 As needed, complete the “DLP-D40 Create a Provisionable Patchcord” task on page 17-31.
Step 8 Complete the “NTP-D343 SNCP Acceptance Test” procedure on page 5-24.
Stop. You have completed this procedure.
68120
Node 1
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 4
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 2
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 3
Slot 5
Tx
Rx
Slot 12
Tx
Rx