EasyManua.ls Logo

Cisco ONS 15454 SDH - Figure 14-1 Three-Node, Two-Fiber MS-Spring before a Fourth Node Is Added; NTP- D353 Add an MS-Spring Node

Cisco ONS 15454 SDH
860 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14-3
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 14 Add and Remove Nodes
NTP- D353 Add an MS-SPRing Node
Figure 14-1 Three-Node, Two-Fiber MS-SPRing Before a Fourth Node Is Added
Figure 14-2 shows a sample drawing of a four-fiber MS-SPRing. The dashed arrow shows the new fiber
connections that will be made to add the fourth node. For four-fiber MS-SPRings, two fiber sets will be
reconnected, the working fiber and the protect fiber.
78740
West East
West East
West East
West East
Slot 5
Tx
Rx
Slot 12
Tx
Rx
New Node
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 2Node 1
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 3
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Working and protect fibers
New fiber connections

Table of Contents

Other manuals for Cisco ONS 15454 SDH

Related product manuals