Chapter 5 Turn Up a Network
NTP- D344 Open-Ended SNCP Acceptance Test
• Node 3 and 4: Slot 5
Note If an ONS 15454 SDH is not connected to a corporate LAN, DCC or MS-DCC provisioning
must be performed through a direct (craft) connection. Remote provisioning is possible only
after all nodes in the network have DCC or MS-DCC terminations provisioned to
Unlocked-enabled STM-N ports.
Step 5 Repeat Steps 3 and 4 for each node in the SNCP.
Step 6 As needed, complete the “DLP-D81 Provision a Proxy Tunnel” task on page 17-73.
Step 7 As needed, complete the “DLP-D90 Provision a Firewall Tunnel” task on page 17-83.
Step 8 Following the documentation provided by the third-party vendor, provision the optical loop leading from
the ONS 15454 SDH connection at one end to the ONS 15454 connection at the other end. In other
words, you will create an open-ended SNCP using procedures for the third-party equipment.
Step 9 Complete the “NTP-D344 Open-Ended SNCP Acceptance Test” procedure on page 5-36.
Stop. You have completed this procedure.
NTP-D344 Open-Ended SNCP Acceptance Test
Step 1 Complete the “DLP-D60 Log into CTC” task on page 17-49 at the node that will be the source node for
traffic traversing the third-party network. If you are already logged in, continue with Step 2.
Step 2 From the View menu, choose Go to Network View.
Step 3 Click the Alarms tab.
a. Verify that the alarm filter is not on. See the “DLP-D227 Disable Alarm Filtering” task on
page 19-25 as necessary.
b. Verify that no unexplained alarms appear on the network. If unexplained alarms appear, resolve
them before continuing. Refer to the Cisco ONS 15454 SDH Troubleshooting Guide if necessary.
c. Complete the “DLP-D147 Export CTC Data” task on page 18-38 to export the alarm information.
Step 4 Click the Conditions tab.
a. Verify that no unexplained conditions appear on the network. If unexplained conditions appear,
resolve them before continuing. Refer to the Cisco ONS 15454 SDH Troubleshooting Guide if
necessary.
b. Complete the “DLP-D147 Export CTC Data” task on page 18-38 to export the conditions
information.
Purpose This procedure tests an open-ended SNCP ring.
Tools/Equipment Test set and cables appropriate to the test circuit you will create.
Prerequisite Procedures NTP-D258 Provision an Open-Ended SNCP, page 5-34
Required/As Needed As needed
Onsite/Remote Onsite
Security Level Provisioning or higher