EasyManua.ls Logo

Cisco ONS 15454 SDH - Table 1-2 ONS 15454 SDH Shelf Installation Task Summary

Cisco ONS 15454 SDH
860 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-19
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 1 Install the Shelf and FMECs
NTP- D13 Perform the Shelf Installation Acceptance Test
Step 2 Complete the “DLP-D32 Inspect the Shelf Installation and Connections” task on page 17-26.
Step 3 Complete the “DLP-D33 Measure Voltage” task on page 17-26.
Step 4 Continue with Chapter 2, “Install Cards and Fiber-Optic Cable.
Stop. You have completed this procedure.
Table 1-2 ONS 15454 SDH Shelf Installation Task Summary
Description Completed
NTP-D1 Unpack and Inspect the ONS 15454 SDH Shelf Assembly, page 1-4
NTP-D2 Install the Shelf Assembly, page 1-5
NTP-D3 Open and Remove the Front Door, page 1-6
NTP-D219 Open and Remove the FMEC Cover, page 1-7
NTP-D220 Install the Power and Signal FMECs, page 1-7
NTP-D6 Install the Power and Ground, page 1-10
NTP-D7 Install the Fan-Tray Assembly, page 1-11
NTP-D222 Install the E1-75/120 Conversion Panel, page 1-13
NTP-D223 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections,
page 1-15
NTP-D224 Install the Electrical Card Cables on the FMECs, page 1-16
NTP-D10 Route Electrical Cables, page 1-16
NTP-D226 Install and Close the FMEC Cover, page 1-17

Table of Contents

Other manuals for Cisco ONS 15454 SDH

Related product manuals