EasyManua.ls Logo

Cisco ONS 15454 SDH - Bit Errors Appear for a Traffic Card; Faulty Fiber-Optic Connections

Cisco ONS 15454 SDH
860 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-7
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 5 Turn Up a Network
NTP- D38 Provision a Linear ADM Network
NTP-D38 Provision a Linear ADM Network
Step 1 Complete the “DLP-D60 Log into CTC” task on page 17-49 at an ONS 15454 SDH where you want to
provision a linear ADM network. If you are already logged in, continue with Step 2.
Figure 5-1 shows three ONS 15454 SDHs in a linear ADM configuration. In this example, working
traffic flows from Slot 5/Node 1 to Slot 5/Node 2, and from Slot 12/Node 2 to Slot 12/Node 3. Slots 6
and 13 contain the protect STM-N cards. Slots 5 and 6 and Slots 12 and 13 are in 1+1 protection.
Figure 5-1 Linear ADM Configuration
Step 2
Click the Provisioning > Protection tabs. Verify that 1+1 protection is created for the STM-N cards at
the node. If the protection group has not been created, complete the “DLP-D73 Create a 1+1 Protection
Group” task on page 17-64.
Step 3 Repeat Steps 1 and 2 for all other nodes that you will include in the linear ADM.
Step 4 Verify that the working and protect cards in the 1+1 protection groups correspond to the physical fiber
connections between the nodes, that is, working cards are fibered to working cards and protect cards are
fibered to protect cards.
Step 5 Complete the “DLP-D363 Provision Regenerator-Section DCC Terminations” task on page 20-68 for
the working STM-N ports on each linear ADM node. Alternatively, if additional bandwidth is needed
for CTC management, complete the “DLP-D364 Provision Multiplex-Section DCC Terminations” task
on page 20-71.
Note If linear ADM nodes are not connected to a LAN, you will need to create the DCC terminations
using a direct (craft) connection to the node. Remote provisioning is possible only after all nodes
without LAN connections have DCC terminations provisioned to Unlocked-enabled STM-N
ports.
Purpose This procedure provisions three or more ONS 15454 SDHs in a linear
ADM configuration.
Tools/Equipment None
Prerequisite Procedures NTP-D35 Verify Node Turn-Up, page 5-2
Required/As Needed As needed
Onsite/Remote Onsite
Security Level Provisioning or higher
Node 1
Node 3
Node 2
Slot 5 to Slot 5
Slot 6 to Slot 6
Slot 12 to Slot 12
Slot 13 to Slot 13
Working Path
Protect Path
34284

Table of Contents

Other manuals for Cisco ONS 15454 SDH

Related product manuals