Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 17 DLPs D1 to D99
DLP- D34 Delete VLANs
Step 2 Using a voltmeter, verify the shelf ground and power wiring:
a. Place the black lead (positive) on the RET1 and the red lead on the BAT1 point. Verify a reading
between –40.5 VDC and –57 VDC. If there is no voltage, check the following and correct if
necessary:
• Battery and ground reversed to the shelf.
• Battery is open or missing.
• Return is open or missing.
Step 3 Repeat Step 1 and Step 2 for the RET2 and BAT2 of the redundant power supply input.
Step 4 Return to your originating procedure (NTP).
DLP-D34 Delete VLANs
Step 1 From the View menu, choose Go to Network View.
Step 2 From the Tools menu, choose Manage VLANS.
Step 3 In the All VLANs dialog box, click the VLAN that you want to remove.
Step 4 Click Delete.
Step 5 In the confirmation dialog box, click Yes .
Step 6 Return to your originating procedure (NTP).
DLP-D35 Delete a Node from the Current Session or Login Group
Purpose This task removes VLANs from a domain.
Tools/Equipment None
Prerequisite Procedures Circuit creation procedure(s) in Chapter 6, “Create Circuits and
Low-Order Tunnels.”
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher
Purpose This task removes a node from the current CTC session or login node
group. To remove a node from a login node group that is not the current
one, see “DLP-D54 Delete a Node from a Specified Login Node Group”
task on page 17-47.
Tools None
Prerequisite Procedures DLP-D60 Log into CTC, page 17-49
Required/As Needed As needed