EasyManua.ls Logo

Cisco ONS 15454 SDH - Perform a Terminal (Inward) Loopback on a Source-Node MXP;TXP;FC_MR Port

Cisco ONS 15454 SDH
860 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-18
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 1 Install the Shelf and FMECs
NTP- D13 Perform the Shelf Installation Acceptance Test
Figure 1-4 ONS 15454 SDH FMEC Cover
Step 4
Attach the ground wire to the shelf.
Step 5 Attach the washer and nut.
Step 6 Attach the cover to the shelf using the screws on the top of the cover.
Stop. You have completed this procedure.
NTP-D13 Perform the Shelf Installation Acceptance Test
Step 1 Complete Table 1-2 by verifying that each applicable procedure was completed.
71087
F
A
N
F
A
IL
C
R
IT
M
A
J
M
IN
Pin hinge
FMEC cover
Hinge-locking
spring
Purpose Use this procedure to perform a shelf installation acceptance test.
Tools/Equipment Voltmeter
Oval and/or block ferrites
Prerequisite Procedures Applicable procedures in Chapter 1, “Install the Shelf and FMECs.
Required/As Needed Required
Onsite/Remote Onsite
Security Level None

Table of Contents

Other manuals for Cisco ONS 15454 SDH

Related product manuals