5-28
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 5 Turn Up a Network
NTP- D218 Provision an Integrated SNCP Dual-Ring Interconnect
NTP-D218 Provision an Integrated SNCP Dual-Ring Interconnect
Step 1 Complete the “DLP-D60 Log into CTC” task on page 17-49. If you are already logged in, continue with
Step 2.
Step 2 Complete the following steps if you have not provisioned the SNCPs that you will interconnect in an
SNCP DRI. If the SNCPs are created, continue with Step 3.
a. Complete the “NTP-D44 Provision SNCP Nodes” procedure on page 5-22 to provision the SNCPs.
b. Complete the “NTP-D343 SNCP Acceptance Test” procedure on page 5-24 to test the SNCPs.
Note All SNCPs that will be interconnected must be at the same STM-N rate.
Step 3 Verify that the SNCP DRI interconnect nodes have STM-N cards installed and have fiber connections to
the other interconnect node:
The STM-N cards that will connect the SNCPs must be installed at the interconnect nodes. The
STM-N cards in the SNCP nodes and the interconnect nodes must be the same type.
The interconnect nodes must have the correct fiber connections. An example is shown in Figure 5-8.
This example shows an SNCP DRI with two rings.
Purpose This procedure provisions SNCP rings in an integrated DRI topology. In
the integrated DRI, the SNCP STM-N trunk (span) cards for both SNCPs
are installed on the same shelf.
Tools/Equipment None
Prerequisite Procedures NTP-D35 Verify Node Turn-Up, page 5-2
Required/As Needed As needed
Onsite/Remote Onsite
Security Level Provisioning or higher