19-5
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 19 DLPs D200 to D299
DLP- D207 Delete a Server Trail
Step 1 Remove the dust plug from the fiber adapter.
Step 2 Insert a CLETOP stick swab (14100400) into the adapter opening and rotate the swab.
Step 3 Place dust plugs on the fiber adapters when not in use.
Step 4 Return to your originating procedure (NTP).
DLP-D207 Delete a Server Trail
Step 1 From the View menu, choose Go to Network View.
Step 2 Click the Provisioning > Server Trails tabs.
Step 3 Click the server trail that you want to delete.
Step 4 Click Delete.
Step 5 In the confirmation dialog box, click Yes .
Step 6 Return to your originating procedure (NTP).
DLP-D208 Change External Alarms Using the AIC-I Card
Step 1 Confirm that external-device relays are wired to the ENVIR ALARMS IN pins on the MIC-A/P Front
Mount Electrical Connection (FMEC). See the “DLP-D324 Install Alarm Cables on the MIC-A/P” task
on page 20-12 for more information.
Step 2 In node view, double-click the AIC-I card to display it in card view.
Step 3 Click the Provisioning > External Alarms tabs.
Purpose This task deletes a server trail.
Tools/Equipment None
Prerequisite Procedures See Chapter 6, “Create Circuits and Low-Order Tunnels” for server trail
creation procedures.
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher
Purpose This task changes the external alarm settings on the AIC-I card.
Tools/Equipment None
Prerequisite Procedures DLP-D60 Log into CTC, page 17-49
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher