EasyManua.ls Logo

Cisco ONS 15454 SDH - Page 422

Cisco ONS 15454 SDH
860 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17-8
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 17 DLPs D1 to D99
DLP- D7 Mount Multiple Shelf Assemblies in a Rack
Figure 17-2 Three-Shelf ONS 15454 SDH Bay Assembly
Step 2
Mount the air ramp above the ONS 15454 SDH. The air ramp is needed if you install more than one shelf
in the ETSI rack. Install the air ramp below the top shelf assembly. To ensure that the air ramp is secure,
use one or two M6 mounting screws for each side of the shelf assembly (Figure 17-3).
61583
Fuse and Alarm Panel,
mountable in the rack
if the rack is 2200 mm
(86.6 in.) high or higher
Air Ramp
ETSIs (SDH)
Air Ramp

Table of Contents

Other manuals for Cisco ONS 15454 SDH

Related product manuals