Index
IN-9
Cisco ONS 15454 SDH Procedure Guide, R6.0
78-17194-01
single-card EtherSwitch manual cross-connect 6-82
testing circuits 6-89
viewing maintenance information 15-17
ESH 18-61
ES-IS, viewing RIB 18-71
Ethernet
See also CE-1000-4 cards
See also CE-100T-8 cards
See also E-Series Ethernet cards
See also G-Series Ethernet cards
See also ML-Series Ethernet cards
changing PM count refresh to a different time
interval
19-63
circuits 6-72 to 6-96
creating RMON thresholds 8-5, 21-28
deleting RMON thresholds 8-5, 21-25
displaying MAC address table 20-4
displaying trunk utilization 20-5
E-Series EtherSwitch circuit 6-72
E-Series multicard EtherSwitch manual
cross-connect
6-85
E-Series shared packed ring circuit 6-77
hub-and-spoke circuit 6-80
installing cards 2-11, 17-30
provisioning CE-1000-4 ports 19-8
provisioning E-Series ports 19-18, 19-19
provisioning G-Series flow control watermarks 20-58
provisioning G-Series ports 6-92, 19-21
resetting cards 15-16, 17-30
testing circuits 6-89
threshold variables (MIBs) 21-29
viewing PM parameters 19-61, 19-62, 19-63
events, viewing 9-2
exercise ring 19-15
exporting
CTC data 18-38
network element defaults 15-27
using the toolbar A-5
external alarms. See AIC-I card
external controls. See AIC-I card
external switching commands
clearing 15-14
clearing an MS-SPRing Force switch 18-82
clearing an MS-SPRing Manual ring switch 19-44
clearing an MS-SPRing span lockout 20-1
clearing an SNCP Force switch 18-85
exercising a four-fiber MS-SPRing span 17-88
exercising an MS-SPRing 19-15
initiating 15-14
initiating a Force switch on a 1+1 port 19-81
initiating a lock-on 19-1
initiating an MS-SPRing Force ring switch 20-3
initiating an MS-SPRing Manual ring switch 20-2
initiating an MS-SPRing span lockout 19-84
initiating an SNCP Force switch 17-92, 18-84
lock out a traffic card 19-2
F
factory configuration. See network element defaults
fan-tray air filter. See air filter
fan-tray assembly
installing 1-11
removing 15-3
replacing 15-22
FC_MR-4 card
changing distance extension port settings 20-61
changing enhanced FC/FICON port settings 20-63
changing general port settings 20-59
changing port and threshold settings 10-5
creating RMON alarm thresholds 21-40
creating VCAT circuits 6-97, 6-101
deleting RMON alarm thresholds 21-44
installing 2-12
installing GBICs on 20-28
monitoring performance 8-6
path trace 19-68