PROCEDURES
iii
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Install the Shelf and FMECs 1-1
NTP-D1 Unpack and Inspect the ONS 15454 SDH Shelf Assembly 1-4
NTP-D2 Install the Shelf Assembly 1-5
NTP-D3 Open and Remove the Front Door 1-6
NTP-D219 Open and Remove the FMEC Cover 1-7
NTP-D220 Install the Power and Signal FMECs 1-7
NTP-D6 Install the Power and Ground 1-10
NTP-D7 Install the Fan-Tray Assembly 1-11
NTP-D222 Install the E1-75/120 Conversion Panel 1-13
NTP-D223 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections 1-15
NTP-D224 Install the Electrical Card Cables on the FMECs 1-16
NTP-D10 Route Electrical Cables 1-16
NTP-D226 Install and Close the FMEC Cover 1-17
NTP-D13 Perform the Shelf Installation Acceptance Test 1-18
Install Cards and Fiber-Optic Cable 2-1
NTP-D15 Install the Common Control Cards 2-2
NTP-D16 Install STM-N Cards and Connectors 2-7
NTP-D17 Install the Electrical Cards 2-10
NTP-D18 Install Ethernet Cards and Connectors 2-11
NTP-D286 Install the FC_MR-4 Cards 2-12
NTP-D348 Install the Filler Cards 2-14
NTP-D349 Install the Blank Faceplates 2-15
NTP-D19 Install Fiber-Optic Cables on Optical Cards 2-16
NTP-D245 Route Fiber-Optic Cables 2-19
NTP-D227 Remove and Replace a Card 2-20
NTP-D20 Replace the Front Door 2-21
Connect the PC and Log into the GUI 3-1
NTP-D278 Set Up Computer for CTC 3-2
NTP-D260 Set Up CTC Computer for Local Craft Connection to the ONS 15454 SDH 3-3
NTP-D261 Set Up a Computer for a Corporate LAN Connection to the ONS 15454 SDH 3-5
NTP-D262 Set Up a Remote Access Connection to the ONS 15454 SDH 3-6