EasyManuals Logo
Home>Enterasys>Other>b5

Enterasys b5 User Manual

Enterasys b5
714 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #46 background imageLoading...
Page #46 background image
Installing a New Stackable System of Up to Eight Units
2-2 Configuring Switches in a Stack
settheIPaddressandsystempasswordusingasingleconsoleport.Noweachswitchcanbe
configuredlocallyusingonlythemanagersconsoleport,orinbandusingaremotedeviceand
theCLIsetofcommandsdescribedinthissection.
Onceastackiscreated(morethanoneswitchis
interconnected),thefollowingprocedureoccurs:
1. Bydefault,unitIDsarearbitrarilyassignedonafirstcome,firstservedbasis.
2. UnitIDsaresavedagainsteachmodule.Then,everytimeaboardispowercycled,itwill
initializewiththesameunitID.Thisisimportantforportspecificinformati on(forexample:
ge.4.12isthe12thGigabitEthernetportonUnit#4).
3. Themanagementelectionprocessusesthefollowingprecedencetoassignamanagement
switch:
a. Previouslyassigned/electedmanagementunit
b. Managementassignedpriority(values115)
c. Hardwarepreferencelevel
d. HighestMACAddress
Usethefollowingrecommendedprocedureswheninstallinganewstackablesystemor
addinga
newunittoanexistingstack.
Installing a New Stackable System of Up to Eight Units
Usethefollowingprocedureforinstallinganewstackofuptoeightunitsoutofthebox.
1. Beforeapplyingpower,makeallphysicalconnectionswiththestackcablesasdescribedin
yourEnterasysB5InstallationGuide.
2. Onceallofthestackcableshavebeenconnected,individuallypoweroneachunit
fromtopto
bottom.
3. (Optional)Ifdesired,changethemanagementunitusingthesetswitchmovemanagement
commandasdescribedinsetswitchmovemanagementonpage210.
4. Oncethedesiredmasterunithasbeenselected,resetthesystemusingtheresetcommand
(page350).
5. Afterthestackhas
beenconfigured,youcanusetheshowswitchunitcommand(page25)to
physicallyidentifyeachunit.Whenyouenterthecommandwithaunitnumber,theMGR
LEDofthespecifiedswitchwillblinkfor10seconds.ThenormalstateofthisLEDisofffor
memberunitsand
steadygreenforthemanagerunit.
Important
The following procedures assume that all units have a clean configuration from manufacturing. When adding
a new unit to an already running stack, it is also assumed that the new unit is using the same firmware image
version as other units in the stack.
Notes: Ensure that each switch is fully operational before applying power to the next switch.
Since unit IDs are assigned on a first-come, first-served basis, this will ensure that unit IDs are
ordered sequentially.
Once unit IDs are assigned, they are persistent and will be retained during a power cycle to any or
all of the units.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Enterasys b5 and is the answer not in the manual?

Enterasys b5 Specifications

General IconGeneral
BrandEnterasys
Modelb5
CategoryOther
LanguageEnglish