8-28. Connector between the storage column 4
magazine and Library Control Blade (top
cover removed) ..........8-30
8-29. Operator Panel cabling .......8-31
8-30. Power Switch/LED Board Assembly 8-32
8-31. 14U library with control module I/O
Station open ...........8-33
8-32. Control module I/O Station ......8-33
8-33. Access holes for manually unlocking I/O
Station doors ...........8-34
8-34. Silver roller locking the I/O Station slide
in place ............8-35
8-35. I/O Station Lock Assembly installed in
library .............8-36
8-36. I/O Station Lock Assembly (top view) 8-36
8-37. I/O Safety Flap Front Spring Wire 8-38
8-38. I/O Safety Flap Pivot Pin ......8-38
8-39. I/O Safety Flap Pivot Pin, Removed 8-39
8-40. I/O Station Safety Flap Bottom Spring
position ............8-39
8-41. I/O Safety Flap Front Spring Wire 8-40
8-42. I/O Safety Flap Link ........8-41
8-43. I/O Safety Flap Pivot Pin ......8-41
8-44. I/O Safety Flap Pivot Pin, Removed 8-42
8-45. I/O Station Safety Flap Bottom Spring
position ............8-42
8-46. Drive sled (detail) .........8-43
8-47. Control Module Drive Sled ......8-44
8-48. Drive sled slot ..........8-45
8-49. Library Control Blade (LCB) .....8-47
8-50. Library Control Blade (LCB) .....8-48
8-51. Removing the Compact Flash Card from
the Library Control Blade ......8-49
8-52. Library Control Blade (LCB) .....8-51
8-53. Power supplies in a control module 8-52
8-54. Power Supply ..........8-53
8-55. Flat cable connector ........8-55
8-56. Thumb screw securing cable spool 8-56
8-57. Cable Spool (with storage columns
removed) ............8-57
8-58. Guide rollers on Y-axis/Picker Assembly 8-58
8-59. Y-axis/Picker Assembly rollers inserted in
gear rack track ..........8-59
8-60. Flat cable connector ........8-60
8-61. Thumb screws ..........8-60
8-62. Y motor connector .........8-62
8-63. Y motor thumb screw ........8-62
8-64. Correct Y motor position .......8-63
8-65. Y motor connector .........8-64
8-66. Y motor connector .........8-65
8-67. Y motor thumb screw
........8-65
8-68. Correct Y motor position .......8-66
8-69. Y motor connector .........8-67
8-70. Thumb screw securing Cable Spool 8-68
8-71. Cable Spool (with storage columns
removed) ............8-69
8-72. Thumbscrew securing Cable Spool 8-70
8-73. Guide rollers on M2 Robot Assembly 8-71
8-74. M2 Robot Assembly rollers inserted in gear
rack track ............8-71
8-75. Picker Assembly on Forward side of
Y-carriage ............8-72
8-76. Press the release lever ........8-73
8-77. Close-up of the release lever .....8-73
8-78. Lift the cable protector .......8-74
8-79. Lift the lever clamp on the back of the
connectors ...........8-75
8-80. Slide cable to the rear ........8-76
8-81. Slide the cables under the plastic guide 8-77
8-82. Guideline ............8-78
8-83. Connect and lock the flex cable 8-78
8-84. Slot on the Picker Assembly......8-79
8-85. Align slot to sheet metal edge .....8-80
8-86. Slide over sheet metal edge ......8-80
8-87. Picker Assembly rollers .......8-81
8-88. Picker locking mechanism ......8-82
8-89. Rotate M2 Picker Assembly ......8-83
8-90. Lift M2 Picker Assembly .......8-83
8-91. Close-up of the release lever .....8-84
8-92. Lift Picker............8-85
8-93. Lift the cable protector .......8-86
8-94. Lift the lever/clamp on the back of the
connectors ...........8-86
8-95. Slide cable forward.........8-87
8-96. Close the cable protector .......8-88
8-97. Remove the Picker Assembly .....8-88
8-98. Insert Picker through the front door 8-89
8-99. Lift the cable protector .......8-90
8-100. Slide the flat cables to the front 8-90
8-101. Black guideline on the cable......8-91
8-102. Locking the cable into place ......8-92
8-103. Closing the cable protector ......8-92
8-104. Slot feature on the Picker Assembly 8-93
8-105. Align slot to the sheet metal edge 8-94
8-106. Slide slot over edge ........8-94
8-107. Lower the Picker Assembly onto the M2
Robot Assembly..........8-95
8-108. Align rollers on the Picker Assembly with
slots on the M2 Robot Assembly ....8-96
8-109. Removing a storage column......8-97
8-110. Correct fiducial placement ......8-97
8-111. Fiducial on storage column ......8-98
8-112. Replacing a Storage Column .....8-99
8-113. Releasing the robot assembly to rest on
the parking tab..........8-101
8-114. Unplugging the Cable Spool Assembly
(library shown in upright position) . . . 8-103
8-115. Securing Spooler flat cable ......8-104
8-116. Cable Spool cable routing through
enclosure wall ..........8-105
8-117. Cable Spool Assembly tabs......8-106
8-118. Front gear rack..........8-107
8-119. Gear rack (detail) .........8-108
8-120. Removing a gear rack .......8-109
8-121. Gear rack (detail) .........8-110
8-122. Rear gear rack location on chassis 8-111
8-123. Cable assembly from the Operator
Control Panel to the Backplane Connector
Board .............8-112
8-124. Backplane Connector Board (BCB), Front
View.............8-113
xiv TS3310 Tape Library Maintenance Information
|
||