EasyManua.ls Logo

Enterasys SecureStack B3

Enterasys SecureStack B3
582 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing a New Stackable System of Up to Eight Units
2-2 Configuring Switches in a Stack
•Theconsoleportonthemanagerswitchremainsactiveforoutofband(local)switch
management,buttheconsoleportoneachmemberswitchisdeactivated.Thisenablesyouto
settheIPaddressandsystempasswordusingasingleconsoleport.Noweachswitchcanbe
configuredlocallyusingonly
themanagersconsoleport,orinbandusingaremotedevice
andtheCLIsetofcommandsdescribedinthissection.
Onceastackiscreated(morethanoneswitchisinterconnected),thefollowingprocedureoccurs:
1. Bydefault,unitIDsarearbitrarilyassignedonafirstcome,firstservedbasis.
2. UnitIDs
aresavedagainsteachmodule.Then,everytimeaboardispowercycled,itwill
initializewiththesameunitID.Thisisimportantforportspecificinformation(forexample:
ge.4.12isthe12thGigabitEthernetportonUnit#4).
3. Themanagementelectionprocessusesthefollowingprecedencetoassign
amanagement
switch:
a. Previouslyassigned/electedmanagementunit
b. Managementassignedpriority(values115)
c. Hardwarepreferencelevel
d. HighestMACAddress
Usethefollowingrecommendedprocedureswheninstallinganewstackablesystemoraddinga
newunittoanexistingstack.
Installing a New Stackable System of Up to Eight Units
Usethefollowingprocedureforinstallinganewstackofuptoeightunitsoutofthebox.
1. Beforeapplyingpower,makeallphysicalconnectionswiththestackcablesasdescribedin
theSecureStackB3InstallationGuides.
2. Onceallofthestackcableshavebeenconnected,individuallypoweroneachunit
fromtopto
bottom.
3. (Optional)Ifdesired,changethemanagementunitusingthesetswitchmovemanagement
commandasdescribedinsetswitchmovemanagementonpage211.
4. Oncethedesiredmasterunithasbeenselected,resetthe systemusingthe resetcommandas
describedinresetonpage
351.
5. Afterthestackhasbeenconfigured,youcanusetheshowswitchunitcommand(“show
switchonpage26)tophysicallyidentifyeachunit.Whenyouenterthecommandwitha
unitnumber,theMGRLEDofthespecifiedswitchwillblinkfor10seconds.Thenormal
state
ofthisLEDisoffformemberunitsandsteadygreenforthemanagerunit.
Important
The following procedures assume that all units have a clean configuration from manufacturing. When adding
a new unit to an already running stack, it is also assumed that the new unit is using the same firmware image
version as other units in the stack.
Notes: Ensure that each switch is fully operational before applying power to the next switch.
Since unit IDs are assigned on a first-come, first-served basis, this will ensure that unit IDs are
ordered sequentially.
Once unit IDs are assigned, they are persistent and will be retained during a power cycle to any or
all of the units.

Table of Contents

Related product manuals