SUBTASK 47-32-01-030-001
(3) Disconnect the electrical connector [7].
SUBTASK 47-32-01-030-002
(4) Disconnect the bonding jumper [12].
SUBTASK 47-32-01-020-001
(5) Do these steps to disconnect the NGS shutoff valve [1] from the bleed air inlet duct [2].
(a) Disconnect the coupling [4].
1) Keep the coupling [4] for the installation.
SUBTASK 47-32-01-020-002
(6) Do these steps to disconnect the NGS shutoff valve [1] from the ozone converter [6]:
(a) Hold the NGS shutoff valve [1] in its position.
(b) Disconnect the coupling [5].
1) Keep the coupling [5] for the installation.
(c) Remove the NGS shutoff valve [1].
(d) Keep the seal [3].
SUBTASK 47-32-01-490-001
(7) Install protective covers on the open bleed air inlet duct [2] and ozone converter [6].
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
47-32-01
Page 403
D633A101-ILF Oct 15/2019
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF 402, 452, 509, 510, 523, 525-528, 568, 569, 576, 577, 581, 583, 585, 588-590,
592-599, 601-603, 606, 607, 610-615, 620, 625-627, 691-699, 833-835, 838, 971, 980-999;
ILF 101, 151, 156-199, 301, 304, 308, 310, 314, 315, 317-319, 323, 331-399, 401, 405,
406, 409, 410, 412, 416, 424, 425, 427-429, 451, 501-504, 507, 508, 512-514, 516, 518,
524, 531-533, 535-537, 541, 542, 552-556, 560-562, 567, 571-575, 671, 672, 686, 703,
707-710, 803-813, 821, 822, 831, 832, 836, 837, 841, 842, 851, 852, 854-858, 861-863,
871-874, 947, 948, 968-970, 972, 973 POST SB 737-47-1003