EasyManua.ls Logo

Boeing 737-600 - Subtask 24-21-22-710-001; Subtask 24-21-22-410-001; Subtask 24-21-22-410-002; Subtask 24-21-22-860-003

Boeing 737-600
2300 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
H. Installation Test
SUBTASK 24-21-22-710-001
(1) Do this task: Operational Test for the AC Generation and Control System,
TASK 24-21-00-700-803.
I. Put the airplane back to its usual condition.
SUBTASK 24-21-22-410-001
(1) Install the applicable forward bulkhead liner.
SUBTASK 24-21-22-410-002
(2) Close this access panel:
Number Name/Location
117A Electronic Equipment Access Door
SUBTASK 24-21-22-860-003
(3) Do this task: Remove Electrical Power, TASK 24-22-00-860-812.
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
24-21-22
Page 414
D633A101-ILF Jun 15/2019
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF ALL

Table of Contents

Related product manuals