H. Installation Test
SUBTASK 24-21-22-710-001
(1) Do this task: Operational Test for the AC Generation and Control System,
TASK 24-21-00-700-803.
I. Put the airplane back to its usual condition.
SUBTASK 24-21-22-410-001
(1) Install the applicable forward bulkhead liner.
SUBTASK 24-21-22-410-002
(2) Close this access panel:
Number Name/Location
117A Electronic Equipment Access Door
SUBTASK 24-21-22-860-003
(3) Do this task: Remove Electrical Power, TASK 24-22-00-860-812.
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
24-21-22
Page 414
D633A101-ILF Jun 15/2019
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF ALL