EasyManua.ls Logo

Boeing 737-600 - Subtask 24-41-11-420-006-002; Subtask 24-41-11-860-018-002; Subtask 24-41-11-860-019-002; Subtask 24-41-11-700-003-002

Boeing 737-600
2300 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(g) Install the washers [12] and nuts [11].
1) Tighten the nuts [11].
SUBTASK 24-41-11-420-006-002
(3) Close the access panel on the forward right hand side of the nose gear wheel well.
G. External Power Receptacle Installation Test
SUBTASK 24-41-11-860-018-002
(1) Do this task: Supply External Power, TASK 24-22-00-860-813.
SUBTASK 24-41-11-860-019-002
(2) Make sure external power comes on line and operates correctly.
H. Cabin Pressure Leak Test
SUBTASK 24-41-11-700-003-002
(1) Do this task to make sure that there are no air leaks: Cabin Pressure Leak Test,
TASK 05-51-91-790-801.
I. Put the Airplane Back to Its Usual Condition
SUBTASK 24-41-11-860-020-002
(1) If electrical power is not necessary, do this task: Remove Electrical Power,
TASK 24-22-00-860-812.
SUBTASK 24-41-11-410-011-002
(2) Close this access panel:
Number Name/Location
114AR External Power Receptacle Door
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
24-41-11
Config 2
Page 408
D633A101-ILF Oct 15/2017
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF 593-599, 601-603, 606, 607, 610-615, 620,
625-627, 691-699, 833-835, 838

Table of Contents

Related product manuals