CARGO DOOR SCUFF PLATE - REMOVAL/INSTALLATION
1. General
A. This procedure contains two tasks:
(1) The first task is the removal of the scuff plates.
(2) second task is the installation of the scuff plates.
B. All the installations of the scuff plates are almost the same.
C. The clearances between the scuff plates and the airplane structure are sealed for aerodynamic
smoothness.
TASK 53-11-02-020-801
2. Cargo Door Scuff Plate - Removal
A. References
Reference Title
51-31-00 P/B 201 SEALS AND SEALING - MAINTENANCE PRACTICES
B. Tools/Equipment
Reference Description
STD-1064
Scraper - Phenolic, Hard Resin
C. Consumable Materials
Reference Description Specification
B00148 Solvent - Methyl Ethyl Ketone (MEK) ASTM D740
D. Expendables/Parts
AMM Item Description AIPC Reference AIPC Effectivity
9 Gasket 53-13-00-05-100 ILF 314, 315, 319, 323,
452, 508, 509, 516, 519,
520, 523, 525-527, 533,
707, 708
53-13-00-05A-120 ILF 156-199, 496-500,
535, 556, 560-564,
567-569, 573-577, 581,
583, 585, 588-590,
592-599, 601-603, 606,
607, 610-615, 620,
625-627, 671, 672,
691-699, 709, 710,
833-835, 838, 841,
854-856, 861-863,
871-874, 948, 968-973,
980-999
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
53-11-02
Page 401
D633A101-ILF Jun 15/2019
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF ALL