D. Start Switch Removal
SUBTASK 80-11-00-860-008-F00
(1) Turn 2 locks in the right and left lower corners, unlatch the P5 overhead panel and put it in the
open position.
SUBTASK 80-11-00-030-001-F00
(2) Disconnect the applicable wire from the switch [1].
(a) Remove each wire lug from the terminal.
SUBTASK 80-11-00-020-001-F00
(3) Remove the knob from the switch [1].
SUBTASK 80-11-00-020-002-F00
(4) If installed, remove the spacer [2].
SUBTASK 80-11-00-020-003-F00
(5) Remove the nut [3] and the washer [4] from the switch [1].
SUBTASK 80-11-00-020-004-F00
(6) Remove the switch [1].
SUBTASK 80-11-00-020-005-F00
(7) If it is necessary, remove the diode from the X1 and X2 terminals of the switch.
NOTE: Keep the diode for installation on the new starter switch.
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
CFM56 ENGINES (CFM56-7)
80-11-00
Page 402
D633A101-ILF Feb 15/2019
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF ALL