1) Apply firm pressure to make sure that the faying surfaces are in contact.
2) Clean unwanted adhesive before it has cured, using a cotton wiper, G00034 that is
moist with solvent, B00083.
NOTE: Do not allow solvent to flow into the bondline.
(e) Cure under constant pressure for 24 hours under 80°F (27°C).
(f) Fill the gap between the conductor straps [2] and the nose radome [1] with sealant,
A50231:
1) Mix components in accordance with the manufacturers instructions.
2) Apply a bead of sealant, A50231 to the gap between the conductor straps [2] and
the nose radome [1].
3) Cure for 24 hours at room temperature.
(3) Install applicable diverter strips [3], do this task: Install the Lightning Diverter Strip,
TASK 53-52-03-400-801.
H. Installation Test
SUBTASK 53-52-03-700-001
(1) Measure the electrical resistance between the applicable diverter strip [3] and conductor
strap [2] with an intrinsically safe approved bonding meter, COM-1550:
(a) Make sure the resistance is not more than 0.001 ohms.
(2) Do this task: Nose Radome - Close, TASK 53-52-00-410-802.
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
53-52-03
Page 409
D633A101-ILF Feb 15/2019
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF ALL