EasyManua.ls Logo

Boeing 737-600 - Task 53-05-03-211-810 - INTERNAL - DETAILED: PASSENGER COMPARTMENT DOOR CUTOUTS; Subtask 53-05-03-010-064; Subtask 53-05-03-211-010; Subtask 53-05-03-910-044

Boeing 737-600
2300 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TASK 53-05-03-211-810
41. INTERNAL - DETAILED: PASSENGER COMPARTMENT DOOR CUTOUTS
Figure 246
NOTE: This procedure is a scheduled maintenance task.
A. Location Zones
Zone Area
222 Passenger Compartment - Aft of Control Compartment to Forward Entry Door -
Right
B. Access Panels
Number Name/Location
222AR Forward Galley Service Door Hinge and Torque Tube Access Panel
S2001 Passenger Compartment Door Cutouts Inspection
C. Inspection
SUBTASK 53-05-03-010-064
(1) Open this access panel:
Number Name/Location
222AR Forward Galley Service Door Hinge and Torque Tube Access Panel
Special Access:
Number Name/Location
S2001 Passenger Compartment Door Cutouts Inspection
NOTE: Remove galleys/lavs. Remove cabin interior as required. Remove/displace insulation
blankets as required.
SUBTASK 53-05-03-211-010
(2) Do a Detailed inspection of the forward galley door cutout surround structure (the door cutout
to, and including, the door side of the first frame from the door in both the forward and aft
directions).
SUBTASK 53-05-03-910-044
(3) 737-6789 Basic Task Description, AMM Task 51-05-01-210-808.
SUBTASK 53-05-03-410-064
(4) Close this access panel:
Number Name/Location
222AR Forward Galley Service Door Hinge and Torque Tube Access Panel
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
53-05-03
Page 298.35
D633A101-ILF Jun 15/2015
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF ALL

Table of Contents

Related product manuals