EasyManua.ls Logo

Boeing 737-600 - Subtask 47-00-00-080-004; Subtask 47-00-00-080-002; Subtask 47-00-00-741-014; Subtask 47-00-00-741-015

Boeing 737-600
2300 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(a) Remove Conditioned Air Supplied by a Cooling Pack, TASK 21-00-00-800-804.
(b) Remove Pressure from the Pneumatic System, TASK 36-00-00-860-806.
SUBTASK 47-00-00-080-004
(2) If installed, disconnect the sense line, SPL-11507, from the GSE O2 test port.
(a) Install the cap on the GSE O2 test port.
SUBTASK 47-00-00-080-002
(3) If used, remove the oxygen analyzer, COM-7456.
SUBTASK 47-00-00-741-014
(4) Do a check of the duct pressure on the dual duct pressure gage:
(a) Make sure the L and R duct pressure is 0 psig (0 kPa).
SUBTASK 47-00-00-741-015
(5) Do this task: APU Usual Shutdown, TASK 49-11-00-860-802, if necessary.
SUBTASK 47-00-00-410-007
(6) Close these access panels:
Number Name/Location
192BL ECS Ram Air Inlet Mixing Duct Panel - Forward
192CL ECS Access Door
192DR ECS High Pressure Access Door
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
47-00-00
Page 507
D633A101-ILF Oct 15/2019
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF 402, 452, 509, 510, 523, 525-528, 568, 569, 576, 577, 581, 583, 585, 588-590,
592-599, 601-603, 606, 607, 610-615, 620, 625-627, 691-699, 833-835, 838, 971, 980-999;
ILF 101, 151, 156-199, 301, 304, 308, 310, 314, 315, 317-319, 323, 331-399, 401, 405,
406, 409, 410, 412, 416, 424, 425, 427-429, 451, 501-504, 507, 508, 512-514, 516, 518,
524, 531-533, 535-537, 541, 542, 552-556, 560-562, 567, 571-575, 671, 672, 686, 703,
707-710, 803-813, 821, 822, 831, 832, 836, 837, 841, 842, 851, 852, 854-858, 861-863,
871-874, 947, 948, 968-970, 972, 973 POST SB 737-47-1003

Table of Contents

Related product manuals