(b) Remove the panel cover on the rear of the power distribution panel to get access to the
load shed relay.
(c) Remove the two screws [2] that hold the terminal cover [3].
(d) Remove the terminal cover [3].
(e) Identify and tag the wires before removing them.
(f) Remove the nut [6] and lockwasher [7] from each electrical wire.
(g) Remove the electrical wires.
(h) Remove the four nuts [4] and washers [5] that hold the relay to the power distribution
panel.
(i) Remove the relay [1].
END OF TASK
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
24-51-11
Page 408
D633A101-ILF Jun 15/2019
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ILF ALL