TX2560 M2 / RX2560 M2 Upgrade and Maintenance Manual
367
11.2 Installing CPUs
V CAUTION!
CPUs are extremely sensitive to electrostatic discharge and must be
handled with care. After a CPU has been removed from its protective
sleeve or from its socket, place it upside down on a nonconducting,
antistatic surface. Never push a CPU over a surface.
11.2.1 Preliminary steps
Ê
"Suspending BitLocker functionality" on page 111
Ê
"Disabling SVOM boot watchdog functionality" on page 112
Ê
"Shutting down the server" on page 58
Ê
"Disconnecting the power cord" on page 59
Ê
"Getting access to the component" on page 61
Ê
"Removing the system air duct" on page 91
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Software: 5 minutes
Tools:
– Phillips PH2 / (+) No. 2 screw driver
– nut driver size 6mm