EasyManua.ls Logo

YASKAWA DX100 - Continuation of the Parallel Shift Function

YASKAWA DX100
554 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-23
155507-1CD
RE-CSO-A037
DX100
6 Convenient Functions
6.3 Parallel Shift Function
6.3.4 Continuation of the Parallel Shift Function
If any of the following operations are performed after executing a parallel
shift instruction, the shift function is cancelled.
• Job editing operation (changing, deleting, adding)
• Job copy, job name change
• Registering a new job, deleting a job, or modifying a selected job
• Restart after the alarm occurs
• When control power is turned OFF
CAUTION
If the shift function is cancelled through a job editing operation after
the execution of a parallel shift instruction, the job must be started
again from the beginning.
Because no shift is performed when the operation is restarted, there
is a possibility of interference between the workpiece and fixture.
NOTE
With any operation other than those listed above, the
parallel shift function remains in effect.
263 of 554

Table of Contents

Other manuals for YASKAWA DX100

Related product manuals