6-43
155507-1CD
RE-CSO-A037
DX100
6 Convenient Functions
6.4 Parallel Shift Job Conversion Function
Variables used in an individual shift
Example 1) When selecting P010 for a coordinated job with R1 + R2:
Use P010 for R1.
Use P011 for R2.
The system with multiple stations
Be sure to use the variables of which numbers are
consecutive after the selected number. The variables of
which numbers are not consecutive are unable to be
selected.