EasyManua.ls Logo

NEC Univerge SV9100 - Chapter 11 NAPT; Section 1 NAPT; Section 2 Conditions; Section 3 Restrictions - Static NAT

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Hardware Manual iii
Issue 3.0
2.3.2 Selecting a Permanent MDF Location ...........................................3-3
2.3.3 Selecting a Site for Installing the Telephones................................3-3
2.4 Constructing the Main Distribution Frame (MDF)............................ 3-3
2.5 Power Failure Transfer.................................................................... 3-4
2.6 Fax CO Branch Connection ............................................................ 3-5
Section 3 Installing the Chassis .............................................................................. 3-5
3.1 Unpacking the Equipment ............................................................... 3-5
3.2 Before Installation............................................................................ 3-5
3.3 Installing the 19” (CHS2UG-US) Chassis........................................ 3-6
3.3.1 Installing the 19” Controlling Chassis.............................................3-8
3.3.2 Installing Expansion Blades in the 19” Chassis (Optional) ............3-9
3.3.2.1 Connector Pin-Out on the GPZ-BS10/GPZ-BS11 ..................3-10
3.3.2.2 Install the GPZ-BS10 Expansion Base Blade in the
CHS2UG-US Controlling Chassis...........................................3-10
3.3.2.3 Install the GPZ-BS11 Expansion Blade in the
CHS2UG-US Expansion Chassis ...........................................3-13
3.3.2.4 Connect the Controlling and Expansion Chassis....................3-17
3.3.3 Install Grounding on 19” Chassis.................................................3-19
3.3.4 Install Grounding on Multiple 19” Chassis (Optional)................... 3-19
3.3.5 Install AC Power Cords on 19” Chassis.......................................3-20
3.3.6 Install AC Power Cords on Multiple 19” Chassis (Optional)......... 3-21
3.3.7 Install Additional Blades 19” Chassis...........................................3-21
3.3.8 Apply Power to the 19” Chassis...................................................3-21
3.4 Installing the 9.5” Gateway (CHS2UG GW-US) and Base
(CHS2UG B-US) Chassis.............................................................. 3-22
3.4.1 Install Grounding on 9.5” Gateway or Base Chassis ................... 3-23
3.4.2 Install AC Power Cord 9.5” Gateway or Base Chassis ................3-23
3.4.3 Install Additional Blades 9.5” Gateway or Base Chassis .............3-23
3.4.4 Apply Power to the 9.5” Gateway or Base Chassis .....................3-23
3.5 Installing the 9.5” Base (CHS2UG B-US) and Expansion
(CHS2UG E) Chassis.................................................................... 3-24
3.5.1 Connecting the 9.5” Base and Expansion Chassis......................3-25

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals