Issue 3.0
SV9100 System Hardware Manual 3-61
4. Align the upper and lower bracket holes with the heads of
anchor bolts mounted on the wall and slide downward
(refer to Figure 3-75 Install Screws (Option 2)).
Or
5. Attach the MV bracket (upper and lower) to the 9.5 inch
Base and Expansion chassis. Refer to section 4.2.2.1
Wall Mounting the CHS2UG B-US without the CHS2UG
B Small Batt Box on page 3-59 steps 1 through 4 for
bracket installation.
Figure 3-75 Install Screws (Option 2)